COMPONENTS OF STRUCTURED CABLING SYSTEMS

   
 
Step 1  Step 1
Step 2  Step 2
Step 3  Step 3
Step 4  Step 4
Step 5  Step 5
Step 6  Step 6
Step 7  Step 7
Step 8  Step 8
Step 9  Step 9
Step 10  Step 10
Step 11  Step 11
Step 12  Step 12
Step 13  Step 13
Step 14  Step 14
Step 15  Step 15
Step 16  Step 16
Step 17  Step 17
Step 18  Step 18
Step 19  Step 19
Step 20  Step 20
Step 21  Step 21

 

How to mount HYPERLINE patch panel, category 6


Previous step Step 9 Next step

Turn the cable to the operating position using a special tool. To terminate the conductors to the IDC module, it is not necessary to press them against the stop using the impact punch down tool.


Category 6 HYPERLINE Patch Panel Mounting

 

 
e-mail: info@hyperline.com
Copyright © 2003-2012 HYPERLINE® Registered Trade-mark; used under license

TERMS AND CONDITIONS OF SALE
Rambler's Top100